Equipment Maintenance Department
Chief Bio-Medical Engineer & Head of the Department : Md. Abdul Halim, M.Sc (APE)
Executive Engineer (Electrical) : Syed Ali Masud; Syed Osman Gani, B.Sc Engr. (EEE)
Senior Bio-Medical Engineer : Md.Towfique Elahi, M.Sc (APE); Md. Tariq Shahriar, B.Sc Engr. (EEE)
Sub-Divisional Engineer : Mr. Utpal Kumar Saha, B.Sc Engr. (EEE)
Bio-Medical Engineer : Mohammod Abdullah Abu Nayeem B.Sc. Engr. (EEE).
Services Rendered: Services of this department rendered to various activities, such as installation repair, maintenance and preventive maintenance of Electro-Medical, Medical Gas System, Compressed Medical Air, Electrical Sub-station, Communication, Audio-Visual, Steam generation, Kitchen, laundry and CSSD Air Conditioning and Refrigeration, Water Supply etc. Some of these are described below.
A. Electro Medical Equipment:
Installation, repair and maintenance work are conducted all electro-medical equipment by our technical team.
- Newly Installation Machines:
S/N. |
Department |
Machines Name |
Model, Brand & Origin |
Quantity |
|
01. |
Septic OT |
Operating table |
Model |
8600 |
02 Pcs. |
Brand |
Dixion |
||||
Origin |
Germany |
||||
02. |
Operating Light |
Model |
Plus LED96 Echo + Plus LED56 Echo |
02 Pcs. |
|
Brand |
klaromed |
||||
Origin |
Poland |
||||
03. |
Urology Department |
Uro-flowmetry Machine |
Model |
Flowmaster |
01 Pc. |
Brand |
MMS International |
||||
Origin |
The Netherlands |
||||
04. |
Physical Medicine |
Treatment Couch ( Bobath) |
Model |
Type 521 |
01 Pcs. |
Brand |
Manumed |
||||
Origin |
The Netherland |
||||
05. |
IFT Machine |
Model |
482 |
01 Pc. |
|
Brand |
Endomed |
||||
Origin |
The Netherland |
||||
06. |
Microbiology
|
Bact Alert 3D 120 |
Model |
Biomenics |
01 Pc. |
Origin |
France |
||||
Brand |
Biomenics |
||||
Origin |
France |
||||
07. |
Centrifuge Machine |
Model |
Rtofix32A |
01 Pc. |
|
Brand |
Hettich |
||||
Origin |
Germany |
||||
08. |
Hospital |
Syringe Pump |
Model |
BYZ810 |
10 Pcs. |
Brand |
Beyond |
||||
Origin |
China |
||||
09. |
Dental |
Dental Unit |
Model |
K3 |
01 Pcs. |
Brand |
Osstem |
||||
Origin |
Korea |
||||
10. |
Ophthalmology |
Direct Ophthalmoscope |
Model |
Professional |
10 Pcs. |
Brand |
Keeler |
||||
Origin |
UK |
||||
11. |
Laser Machine ( Argon) |
Model |
GYC-500 |
01 Pc. |
|
Brand |
Nidek |
||||
Origin |
JAPAN |
||||
12. |
Slit Lamp with application Tonometer |
Model |
KSL-H |
05 Pcs |
|
Brand |
Keeler |
||||
Origin |
UK |
||||
13. |
Transfusion Medicine Department |
Blood Collector Monitor |
Model |
HemoTek2 |
10 Pcs. |
Brand |
Delcon |
||||
Origin |
Italy |
||||
14. |
Blood Donation Chair |
Model |
Comfort III |
02 Unit |
|
Brand |
LMB |
||||
Origin |
Germany |
||||
15. |
Intensive Care Unit |
High End Color Doppler Ultrasound System |
Model |
Logic P9 |
01 Unit |
Brand |
GE |
||||
Origin |
Korea |
||||
16. |
GHPD |
C-Arm Table |
Model |
1201 |
01 Unit |
Brand |
Technomed |
||||
Origin |
India |
- Repair & Maintenance & Preventive Maintenance :
Major repair done of the following Machines: CT Scan Machine, MRI Machine, X-Ray Machine, Ultrasound System, Operating Microscope, Phaco Machine, Speculer Microscope, Angio-Fundus Camera Machine, Visual Field Analyzer (VFA) Machine, Green Laser (Argon Laser) Machine, Slit Lamp, Ophthalmic OT Table, ICU Ventilator, Patient Monitor, Suction, Anesthesia Machine, Diathermy Machine, OT Table, OT Light, Binocular Microscope, Trinocular Microscope, Dialysis Machine, RO Machine etc. and maintenance and Preventive maintenance work are conducted all electro-medical equipment by our technical team in our own work shop.
- Electrical works :
SL# |
Description of works |
Location |
1. |
1st floor to Ground floor (Old Building) public canteen, Sraff canteen sifting and Electric & A/C work |
Old building specialized chamber complex |
2. |
2nd floor to ground floor old specialized chamber to complex2nd floor sosal wefair room , insulin counter shifting , New lecture room , Nuration room shifting Elec & A/C Works |
1st Floor of BIRDEM |
3. |
2nd Floor Empoy Association of Diabetic Association Electric & A/C works |
2nd Floor of BIRDEM |
4. |
9th floor 12th ward Electric renovation works |
9th & 12th floor |
5. |
3rd floor OT Renuvation works |
3rd Floor Of BIRDEM |
6. |
2nd Floor BADAS CHRI project Electric & A/C Works |
2nd Floor of BIRDEM |
7. |
Ward # 142,132,131,121,102,111 ward Fan Ranuvation Works |
13,12,11,10,09th Floor of BIRDEM |
8. |
05,09 12 13 14th Floor new nurses call installation.
|
05,09 12 13 14th Floor of BIRDEM |
9. |
09,13th floor pentry room electric &A/C renovation works. |
9 & 13th Floor of BIRDEM |
10. |
14,13,12,11,10 ,1st, 2nd Ground Floor Electric renovation and GI tray setting works |
14,13,12,11,10 ,1st, 2nd Ground Floor of BIRDEM |
11. |
53 No ward Electric ranuvatio works |
Ward -53 of BIRDEM |
12. |
Ward # 132& 142 Electric Renuvation works. |
12&13 th floor of BIRDEM
|
13. |
Counter #10 electric renovation works |
OPD Of BIRDEM |
14. |
Cabin # 1511,1512,1513,1514 Electric & A/C renovation works |
14 th floor of BIRDEM
|
15. |
R-1414 Electric Renuvation works |
13th floor of BIRDEM |
16. |
R-1009,1010,1011,1012 1115 Electric & A/C renovation works |
9th and 10th floor of BIRDEM. |
17. |
W-93 Side Room Electricand A/C ranuvation works |
8th Floor of BIRDEM |
18. |
Beside these Rutine maintenance work done by Electric Distribution Board, ESDB, Lift, Boiler, Ceiling Fan , Hospital Bed, Loundry Machine done by BIRDEM Electric division. |
Hospital |
19, |
05 Nos of Feed water pump repair and Maitenance work done by BIRBEM Engineers. |
Ground Floor of BIRDEM |
20 |
11KV/440 Substation 2400 KVA Transformer , 340 and 500 KVA Disel Generator maintenance work done by BIRBEM Engineers.. |
Ground Floor of BIRDEM |
C. Air Conditioning & Refrigeration System:
- Newly installed split type and wall type Air Condition System at different places of hospital.
- Maintenance, preventive maintenance and necessary repair work for all split & window type AC of BIRDEM General Hospital are conducted by our experience technical team.
D. Communication, Audio-Visual & CCTV System.
- Maintenance, preventive maintenance and necessary repair work done for Communication
equipment, Audio-Visual System & CCTV system of BIRDEM General Hospital are conducted by our experienced technical team.
E. Kitchen, laundry, CSSD & Boiler:
- Maintenance, preventive maintenance and necessary repair work are conducted by our experience technical team.
F. Central Medical Gas Plant & Medical Gas Pipeline System:
- Maintenance, Preventive Maintenance and necessary repair work done for Central Medical Gas plant of BIRDEM General Hospital are conducted by our Experience technical team.